We decided to put in after the rain cleared. Our put in was Marrowbone to Mitchell rd. The Henry County sites are helpful.
http://www.henrycountyva.gov/Parks.html and http://www.henrycountyva.gov/content/File/pdfs/ParksandRec/parks__rec_map_brochure_layout_1.pdf
This stretch is about 3.37 miles long. With not dam water release it took us 2 hours. I have heard with a dam release water it is 1 - 1/2 hours. This a a very pretty stretch with many rapids we put in before the dam water reached this section and the river gauge in Martinsville said 2ft which is a min. for this section. This was one of the prettiest sections I have ever done. I hope to do this with dam water. Discovered it takes 4 hours for the dam release water to reach Marrowbone. If the Martinsville dam releases at 1-5 like usual M-F then the water will reach here by 5 but is is easy to out run the water so 5:30 -6 might be better.
This section has so many rock formations in the water and 10 class 1 or 2 rapids in 3.75 miles. In low water this run is interesting but look forward to doing it with the dam release water.
No comments:
Post a Comment